Covid-19 Cleaning Services

During these unprecedented times we have all had to adjust our personal lives or work. Here at Darjac Llc. , we have pivoted by providing cleaning services related to Covid-19 for commercial properties. Our team has begun sanitizing and disinfecting for offices, stores, hotels, and construction projects. We are also supplying PPE to compliance officers, including masks, gloves, and cleaning agents.

Call us today if you would like to discuss how Darjac can help you 617-784-7955

Office Decommissioning

Office furniture decommission is the process of removing surplus, unwanted or potentially unsafe items of office furniture from your inventory. While decommissioning office furniture can happen at any time, it invariably becomes an issue during a business move or during a liquidation.

Most businesses (even small ones with limited storage space) can be surprised to discover just how much furniture they have on-hand (either in use or storage), but don’t want to take with them to their new location.

To learn more about how the Darjac team can completely serve your office furniture decommission needs, contact us today. As always, your consultation is free and there is no obligation or risk.

Recycling

If your company is serious about environment conservation and waste reduction, then you may consider other options for your office furniture if it cannot sell.

Recycle: If the furniture is not suitable for reuse at all (perhaps it’s damaged beyond repair) it will be disassembled, separated into various materials (such as metals, plastics, and fabrics) and sent to the appropriate recycling center. Stuffed furniture may be accepted at your local mattress recycler.

Re-purpose: If the furniture is not suitable for reuse, you might instead like to re-purpose it. We have seen various components turned into a sculpture, seating used in children’s cubby houses, and new legs added to a desktop for a dining table.

Donate: There are organizations that can help facilitate furnishings and equipment donations to charities and schools around the world who could really benefit from used furniture. Companies that go this route not only benefit from knowing that their products are helping those less fortunate, but they benefit from a tax write-off as well.

Construction Division

Planning is Key

To keep a construction site productive good planning is the key. The general contractor must create a timeline for each stage of the project far in advance of the project start. The plan must include a total inventory of materials, equipment, and tools needed for each stage of the project. When you effectively manage materials from their source to your site you can finish your projects on time and within budget. At Darjac we help you keep things on track to keep your jobs running on schedule and staying profitable. Call us today to discuss your project.

Logistical Support

Darjac LLC

When your construction company is tasked with the planning, execution, and control of procurement, transport, and stationing of workers and material and other resources to achieve the goals of a construction project you will need support. The absence of a logistical plan for a construction site can lead to the creation of bottlenecks that place a stranglehold on the project and may prevent the completion of the project in a timely manner. You can count on Darjac to help you plan and execute your projects to assure all aspects of the project run effectively.

Portable Toilets

Darjac takes pride in providing the best construction site services available. Whether your construction site is a high-rise in a major city, an interstate highway, residential, or a small remodel job, we provide the best service guaranteed. Regardless of the size of your job, you can be assured we will accommodate all of your construction toilet rental needs.

The productivity of your workforce is at its best when the right number of portable bathrooms are placed on your construction site. We want your company to be at the maximum productivity level at all times and we offer you the resources to do so.

Procurement

For construction projects, procurement methods go beyond mere acquisition of goods and services and can be considered a support structure for a temporary production line because every construction project is itself a small factory producing a single item, and the procurement function exists to enable completion within time constraints, scope of work, and budget. Procurement managers must juggle many tasks when handling complex construction projects. Darjac can help you manage these challenges to successfully complete your project within the required parameters.

Jersey Barriers

A concrete barrier is utilized to separate lanes of traffic and assists with crowd control for events. Darjac can deliver and pick up all of the barrier you need for your worksite. Our efficient delivery will assure prompt service for large or small projects. Free up your equipment, that would have been used placing barriers, to finish your job on schedule.

Dumpsters

We go above and beyond for each and every one of our customers. From those looking for a smaller dumpster for smaller projects or those looking for extra large dumpsters or multiple dumpsters you can count on Darjac to help you manage waste disposal.

Commercial Equipment Rental

Construction company challenges become our challenges, and your deadlines drive ours. Renting great equipment will be the easiest part of your job because we promise availability, reliability, and ease of use from both our people and our rental products. We understand that your daily equipment rental needs can vary by project stage or season and we are committed to helping you each step of the project.